Questions
Questions about the plan, the wash and the wood
Answers about the walk-through, the written plan, weather and what is quoted separately.
How does the two-year plan work?
You get one visit a year. In the first year we wash the wood with a mildew cleaner, let it dry, repair the small things and stain it. In the second year we wash it again and check it, touching up the steps and rail tops. In the third year we re-stain, and the cycle repeats.
What is in the mildew wash?
A mildew cleaner brushed on and worked in, a scrub of the boards and rails, and a rinse. Plants and grass are wet down and covered first. It happens at every visit, not only before a stain.
How long does a visit take?
A stain visit on a deck of about 300 square feet is usually two to four working days, with a drying day in the middle. A wash-and-check visit is usually a half day to a day. These are ranges; the weather decides the exact days, and we text you the plan for the week.
Do I need to be home?
No. We need access to the deck and fence, a hose spigot and a place to park. We text before we arrive and when we leave, and we will tell you what we saw.
What does the written plan say?
The wood we looked at and its size, the repairs we will make, how many coats, the stain tone and finish, the visit months, the yearly price, what is not included and how to cancel. You get it after the walk-through, before anything is billed.
What is not included?
Replacing rotted boards or posts, stripping a stain or paint that has failed, and anything we find under the wood that was not visible at the walk-through. We quote each in writing before we do it.
Which stain do you use?
A premium exterior stain in the tone you choose. Ask for the product data sheet and we will send it with the plan. We use the same stain at every visit unless you want to change tone.
What if it rains?
We do not stain wet wood or in a wet forecast. A visit that falls on a bad day moves to the next dry one, and we text you the new day. Wash-and-check visits are more forgiving than stain visits.
Does the 1978 lead rule matter for a deck or fence?
It can. Federal rules cover paid work that disturbs painted surfaces in homes and child-occupied buildings built before 1978. If your home is older, tell us when you book. We follow those rules where the work touches painted wood, and our EPA firm number is in the footer.
Can you stain over a painted or solid finish?
Sometimes. Stain needs to soak into wood, so a failed paint or solid-color coat has to come off first. We tell you at the walk-through whether the wood needs stripping and quote it separately.
Can I cancel the plan?
Yes. Call or text before your renewal date. We send a reminder 30 days ahead. You owe nothing for a year you have not started, and the terms are in your written plan.
What about my plants and the grass?
We wet down and cover plants near the work and rinse as we go. Heavy shrubs against a fence sometimes have to be tied back, and we will say so at the walk-through.
Can I add a fence or gate later?
Yes. We can add it at the next renewal or write a one-time quote now. The plan price follows the footage on the written plan.
Can I see the tone before you stain?
Yes. We brush a sample on a spare board or an out-of-the-way spot at the walk-through, and you look at it in your own light before choosing.
Request a walk-through
Not answered here?
Send the question with a photo and we will reply the next working day.